“Samruk Green Energy” LLP

Interest: 100%

samruk-green.kz

Samruk-Green Energy Limited Liability Partnership was established on January 25, 2012 and provides services for the production of electrical energy, design and construction of facilities using renewable energy sources.

The only participant of Samruk-Green Energy LLP is Samruk-Energy JSC - 100% stake.

Today, the total installed capacity is 8.6 MW.

Since 2013, the project of a solar power plant (SPP) of Samruk Green Energy LLP in the city of Konaev, Almaty region with a total capacity of 2 MW and a SPP of 416 kW has been launched, an increase in the capacity of the SPP has been carried out (with a capacity of 1 MW in the Alatau microdistrict of Almaty) and WPP (with a capacity of 5 MW, Nurly village, Enbekshikazakh district, Almaty region). Also, the project for the construction of a 50 MW solar power plant in the area of Kapshagay is being developed.