Project title
- Modernization of Shardarinskaya HPP
Project description
- Reconstruction of Shardarinskaya HPP with replacement of 4 hydraulic units and increase in installed capacity from 100 MW to 126 MW
Purpose
- To improve performance and reliability of the hydropower plant
Implementation period
Project cost according to FS
Technical solutions
- 4 hydraulic turbines manufactured by Andritz Hydro GmbH with a capacity of 31.5 MW each. Parameters of the turbine: adjustable blade turbine ("Kaplan" with adjustable blades), design head 17.8 m. of water col., design flow 200 m3 / s, rated speed - 115 rpm, number of blades - 5, impeller diameter - 5.3 m
Effect
- Increase in the installed capacity up to 126 MW
- Enhancement hydropower plant reliability
Number of jobs
- During construction – 176 persons
- During operation – 156-158 persons
Current status
- Dismantling and assembly works are underway